Sunday, 28 February 2010
Annual NICEIC Inspection
I've got my annual NICEIC inspection tomorrow. Should be fine (but I've got everything crossed that I can cross!). It's a lot of beaurocracy and work, but worth it; my livelihood depends on it so I have to make sure everything goes as well as possible. It keeps the cowboys at bay (although how some people manage to pass given the state of some electrical installations I've seen is beyond me) and I've prepared my customers and arranged my office (i.e. the dining room table) with all the necessary required bumpf with the necessary documentation. Fingers crossed!
Saturday, 27 February 2010
Manic for Synaptica
It's been a while since I posted.
It's been manic for Synaptica. The stair lift power installations are keeping me and my subcontractors really busy, as well as all the other work. I mustn't complain though. Too much work is infinitely preferable to too little.
As I thought, the lady electricians (Ina & Clare) have been fantastic; I don't know how I'd cope without them.
On friday we all attended a course by Raychem, the underfloor heating giant. We're now Certified Pro installers for their underfloor heating products!
It's been manic for Synaptica. The stair lift power installations are keeping me and my subcontractors really busy, as well as all the other work. I mustn't complain though. Too much work is infinitely preferable to too little.
As I thought, the lady electricians (Ina & Clare) have been fantastic; I don't know how I'd cope without them.
On friday we all attended a course by Raychem, the underfloor heating giant. We're now Certified Pro installers for their underfloor heating products!
Subscribe to:
Posts (Atom)
